![]() |
Twin ShearSign Up for Email News Alerts |
Twin Shear![]() Twin Shear, also situated within the Block B group of concessions, currently has a NI 43-101 compliant inferred resource estimate of 482,000 oz/Au. The Twin Shear Resource was estimated by Scott Wilson RPA using a cut off of 8 g/t Au and a grade cap of 50g/t Au with a density of 2.7 used for all material. It is based on a total of 36 diamond drill hole intersections along a 1 km portion of a 2.2 km long structure. The structure is adjacent to the principal structures in the Isidora Mine. The mineralized zone has variable widths generally between 1 and 4 metres.
|
|
Home Corporate News Projects Investors Contact Us Disclaimer & Privacy Policy |
|